Follow this link to skip to the main content
Jet Propulsion Laboratory
+ View the NASA Portal
Go!
JPL Home JPL Home Page - Earth JPL Home Page - Solar System JPL Home Page - Stars and Galaxies JPL Home Page - Technology
Cassini-Huygens: Mission to Saturn and Titan Cassini-Huygens: Mission to Saturn and Titan
California Institute of Technology Jet Propulsion Labaoratory NASA
For News Media
For Planetariums & More
For Educators
For Kids
Home
Overview
Multimedia
Cassini at Saturn
Mission
Spacecraft
Science
NEWS - Press Releases - 2000

Cassini Significant Event Report
For Week Ending 08/10/00

The most recent spacecraft telemetry was acquired from the Goldstone tracking station on Wednesday, 08/09. The Cassini spacecraft is in an excellent state of health and is operating normally. The speed of the spacecraft can be viewed on the "Where is Cassini Now?" web page.

This week's activity onboard the spacecraft focused exclusively on the first phase of Command & Data Subsystem Flight Software (CDS FSW) Checkout.

The CDS FSW team, as well as the entire Spacecraft Office (SCO), reached a milestone on August 9, with the switching of CDS prime software to Version 7_011. The string swap completed successfully and CDS_A has transitioned to prime. Prior to the switch, a test of the CDS SSR-A memory and power controller was performed. These tests are run regularly before each turn off and after each turn on. Following successful turn on and testing, SSR-A was loaded with CDS, Attitude and Articulation Control Subsystem (AACS), and Instrument FSW from SSR-B. Throughout this portion of the checkout, all subsystems on the spacecraft operated normally and downlink from the spacecraft was resumed after a 5 minute planned outage. Version 7_011 has several updates necessary for support of sequences during the Jupiter flyby, and utilizes a new System Fault Protection algorithm.

All the required files for the instrument turn-on scheduled for the end of C21 have been received, integrated and placed on Distributed Object Manager (DOM) for review.

Files for the Preliminary Sequence Integration and Validation phase (SIV) for C22 have been delivered and the Sequence of Events (SOE) and Space Flight Operations Schedule (SFOS) files generated. Plans were finalized for Integration Test Laboratory (ITL) testing of one activity in the C22 background sequence, the observation of the star Fomalhaut. In addition, plans were made for testing of the real-time flight software loads for the Cassini Plasma Spectrometer (CAPS) and the Cosmic Dust Analyzer (CDA). C22 contains activities that complete Instrument Checkout, and begin Jupiter science.

Instrument Operations (IO) and the Telecommunications and Mission Operations Directorate (TMOD) completed the VoIP (Voice-over-Internet Protocol) test with the Huygens Probe Operations Center (HPOC). TMOD is currently evaluating an option for decommissioning analog voice lines and combining both data and voice over a single line. This technology is expected to save NASA almost $130K / year / circuit. The intent of the test was to demonstrate the feasibility of this concept. It proved to be very successful.

IO completed initial delivery of Imaging Science Subsystem / Visual and Infrared Mapping Spectrometer (ISS/VIMS) Level 1A data product ground software to the Multi-mission Image Processing Laboratory (MIPL).

During Instrument Checkout 2 (ICO) Quiet Test (July 26, 2000), ISS took 23 Narrow Angle Camera (NAC) and 23 Wide Angle Camera (WAC) images during the "noisy" mode, and 30 NAC and 22 WAC images during the "listening" mode. The data were read, stored, then downloaded for engineering analysis. The data have been delivered to the ISS and VIMS science teams.

Preliminary analysis of RPWS data from the Quiet Test has been released. Overall the spacecraft and instruments were observed to be very quiet. This second data set has been compared with the results of the first ICO in January 1999. In general the results are similar for the two tests. Analysis of this data will continue for some time.

IO has completed Version 1 of the Archive Plan for Science Data, and distributed it for signature.

All Cassini teams participated in the NASA Quarterly review (aka GPMC) held this week at JPL.

The Cassini/Huygens Spacecraft Geometry Reference Tool (aka the mug) is currently available for sale to Flight Team members. The detailed information provided on science instrumentation, spacecraft axes and major components has already proven to be extremely valuable and is being widely utilized by program members.

The Cassini Real-time operations area was one of the locations visited by a TV crew from the British Broadcasting Corporation (BBC). The crew was collecting material for a children's program focused on space.

Forty three master teachers participating in the Solar System Educator Program were introduced to the Cassini Program and its educational materials. This included classroom demonstrations, student activities involving light scattering, gravity assist, and planetary magnetic fields, and a tour of the Cassini real time operations area. Cassini's joint flyby of Jupiter with Galileo was described, including the cooperation with the Goldstone Apple Valley Radio Telescope (GAVRT) program to monitor Jupiter for both science and calibration purposes during Cassini's flyby.

Additional information about Cassini-Huygens is online at http://saturn.jpl.nasa.gov.

Cassini will begin orbiting Saturn on July 1, 2004, and release its piggybacked Huygens probe about six months later for descent through the thick atmosphere of the moon Titan. Cassini-Huygens is a cooperative mission of NASA, the European Space Agency and the Italian Space Agency. JPL, a division of the California Institute of Technology in Pasadena, manages the mission for NASA's Office of Space Science, Washington, D.C.

Media Relations Office
Jet Propulsion Laboratory
California Institute of Technology
National Aeronautics and Space Administration
Pasadena, Calif. 91109.
Telephone (818) 354-5011

Privacy Statement Glossary Sitemap FAQ
FirstGov NASA
Outreach Manager: Alice Wessen
Editor: Kirk Munsell
Science Writer: Enrico Piazza
Webmaster: Allan Yu.
Last Updated: 04.06.2005
JPL Clearance: CL02-2452
+ Contact Us